Arab News, Tuesday, Sep 22, 2020 | Safar 05, 1442
UAE dives into Lake Manzala project
Emirates: The UAE National Marine Dredging Company (NMDC)
has announced that it won the rights to the expansion project of Lake Manzala in
Egypt, valued at 600 million UAE dirhams ($163 million).
The company’s announcement of the new project came following a disclosure
published on the Abu Dhabi Securities Exchange website. It ensures compliance
with the principle of disclosure and transparency in force in the UAE.
Lake Manzala is one of Egypt’s largest natural lakes. It is known for its
potential fishing opportunities, as it has the basis for high fish stocks due to
natural nutrients and a moderate climate throughout the year. It produces about
half of the natural fish production in lakes.
The lake has witnessed neglect in recent years, losing much of its importance
and wealth. In May 2017 Egyptian President Abdel Fattah El-Sisi launched a
national project to develop Egyptian lakes, with a key focus on Lake Manzala.
NMDC said in a statement that winning the project came through its partnership
with the Egyptian-Emirati Challenge Company. It said that it will take about two
years to implement the project.
NMDC is one of the leading companies in the field of dredging, land reclamation
and civil and marine construction in the Middle East. The Lake Manzala
development project aims to improve the quality of water to restore free fishing
and return the lake to its previous state, which will boost the local market and
export output.
President El-Sisi said that Lake Manzala will contribute to enhancing Egypt’s
fishing industry, and export operations will be activated after its full
development. He directed the border governorates, in coordination with the
Ministry of Interior and the Armed Forces, to remove all encroachments and
criminal outposts on the lake.
Several days ago, Dakahlia governorate completed a difficult operation to remove
encroachments on the lake. A large campaign that used Armed Forces Engineering
Authority equipment removed 301 houses in the Abdo El-Salhy area in El-Matareya
city, known as the “fishermen’s land,” which was built on areas that were filled
in from the lake. The operation occurred after local fishermen were persuaded to
obtain compensation for vacating their houses.
Magdy Zaher, executive director of Manzala Lake, said that the engineering
authority used 320 excavators and 20 imported suction dredgers to work in the
lake
The authority dredged the upper islands isolated from the water with the help of
an Emirati bulldozing company to increase the efficiency and purification of
Lake Manzala.
Zaher said the lake project will require several steps.
The most important is the removal of encroachments on the water surface and
doubling its area to 250,000 feddans, he said. Dredging and deepening the lake,
opening the gates and extending the radial channels to allow Mediterranean
waters to enter the lake will follow, he added.
A safety belt will come in the form of a road 80 km long and 30 meters wide,
which will surround the lake and prevent future encroachments. It will also
divert the course of the Bahr El-Baqar water treatment plant, which pours 12
million cubic meters of sanitary, industrial and agricultural drainage into the
lake, Zaher said.